The Blueprint


Visit CEO Greg Howes’ IDEAbuilder blog by clicking here.


CAM CNC fabrication in Cascadia

Posted by on Oct 15, 2010 in CAM, CNC, cutmytimber, digital fabrication, fabrication, hundegger, K2, timber frame | 0 comments

We finally have the CutMyTimber blog live. Here it is with some great photos of a timber frame project we cut in...

read more

CutMyTimber : Digital Manufacturing: Paperless from FIM model to CNC mac…

Posted by on Aug 13, 2010 in cadwork, CAM, CNC, computer-aided-manufacturing, computer-numeric-control, cutmytimber, design2machine, design2production, fabrication, high-performance building, hundegger, ideabuilder | 0 comments

Here is a great example or integrated design and manufacturing. The video is only 12 minutes long and is a great case study for real integrated project...

read more

Is Modular Construction a greener way to build?

Posted by on Aug 4, 2010 in building, green, modular, prefab, yale green | 0 comments

Yale and the University of Virginia released some preliminary findings and expect to release a full report later this year. Although I look forward to reading the full report I still have difficulty understanding why this hasn’t been studied before? In the era of total-cost-of-ownership and environmental footprint why hasn’t the environmental impact of different construction methods received more R&D dollars?

read more